01 / ENGINEERING & SALES
From specification to quotation. Capture requirements, shortlist fan families and prepare a structured RFQ package.
Preview quotation ↗ Open RFQs 28 Illustrative workload
Awaiting engineering 09 Sample pipeline
Quotation turnaround 3.2 d Demo metric
Approved designs 146 Sample library
New application requirement Example customer RFQ · adjust values and generate a requirement summary.
Generate RFQ summary Reset
Engineering review required: this demo does not calculate performance curves, motor sizing, efficiency or a validated fan model.
Candidate engineering workflow Rule-based review, drawing lookup and costing can connect to existing TCF systems.
01 · Customer requirements Airflow, pressure, operating conditions
Captured 02 · Engineering selection Validated fan curves and design rules
Review 03 · Drawing / BOM retrieval Approved historical designs and revisions
Integration 04 · Commercial quotation Costing, margin, approvals and export
Workflow Pitch value: reduce repetitive data entry and help engineers reuse approved knowledge without replacing technical judgment.
Recent RFQ pipeline Fictional demonstration records — click a project to load its specifications.
RFQ Customer / project Application Airflow Status RFQ-1048 Acme Process Industries Dust collection 24,000 m³/h Engineering review Open RFQ-1047 Northstar Foods Industrial dryer / oven 18,000 m³/h Ready to quote Open RFQ-1046 Metro Pharma Labs Pharmaceutical exhaust 12,500 m³/h New Open
02 / PRODUCTION OPERATIONS
One view of every manufacturing order. Monitor the handoffs from engineering release through fabrication, assembly, testing and dispatch.
Refresh dashboard ↻ Active work orders 42 Across sample stages
On-time completion 91% Demo KPI
Awaiting testing 08 Action required
At-risk deliveries 03 Illustrative alerts
Production flow Click any stage to view example work orders.
Engineering 07
Fabrication 12
Assembly 10
Testing 08
Dispatch 05
Select a production stage to inspect the sample workload.
Work-order tracker Sample orders with clickable details.
Order Project Stage Target Risk WO-2084 Process exhaust fan Testing 30 Oct Attention WO-2085 Dust collector fan Fabrication 03 Nov On track WO-2086 Industrial oven fan Engineering 06 Nov At risk
Production exceptions An operations manager's actionable daily list.
WO-2086 · Drawing approval pending Engineering release has not been signed off.
Assign review WO-2084 · Balance test rescheduled Quality check requires a revised test slot.
Request test slot
03 / AFTERMARKET & CONNECTED EQUIPMENT
Service intelligence for installed fans. Connect asset records, technician inspections and condition-monitoring alerts.
Simulate sensor reading ↻ Registered assets 1,248 Sample installed base
Monitored online 186 Illustrative devices
Open service cases 14 Demo workload
Condition alerts 03 Simulated thresholds
Asset health · FAN-IND-0042 Illustrative vibration readings, not live equipment data or a certified diagnostic system.
Vibration velocity 4.2 mm/s Review threshold
Bearing temperature 68 °C Example sensor input
Blue: simulated vibration trend · Orange: illustrative review line
Create inspection task View asset record
Service event queue Combine periodic maintenance with field inspections and customer support.
FAN-IND-0042 · Vibration review Customer: Acme Process Industries
Review FAN-IND-0109 · Routine inspection Customer: Northstar Foods
Scheduled FAN-IND-0177 · Retrofit enquiry Customer: Metro Pharma Labs
Assigned Potential business model: a customer portal and service platform, optionally enhanced with connected sensors. Device integration and diagnostic thresholds require engineering validation.
Installed equipment registry Asset ID Site Application Last inspection Condition FAN-IND-0042 Chennai · Plant 2 Dust collection 18 Oct 2026 Review Details FAN-IND-0109 Pune · Line 1 Industrial dryer 11 Oct 2026 Normal Details